48" × 47.5 km OB3 Gas Pipeline Commissioning
Client: NNPC / NEDOGAS / XENERGI | Scope: Pre-commissioning & Commissioning
Dewatering, swabbing, drying, nitrogen purging and gas-in operations for a 48" × 47.5 km gas transmission pipeline (KP64.5–KP17), supporting safe start-up of national gas infrastructure.